Ultragen is a leader in Used Motor Oil (UMO) Processing, with 20 years of EPCM experience and over 50 revamp/grass roots projects completed on two continents. Designs can be tailored for either VGO or Base Oil production, and elimination of asphalt flux. We have offices in North America and France. Ultragen can develop preliminary and detailed designs, plant layouts, and cost estimates in a timely and competitive manner. The company’s specialty is turnkey projects, including commissioning, start-up and follow-up support.

Projects:

FCC Lubricants

FCC had decided to construct a grass roots used motor oil recycling plant of 40.0 MMUSG/year capacity. FCC had originally selected an overseas supplier for EPCM services in 2012. However, due to slow engineering progress FCC made inquiries in the UMO industry and was thereby introduced to Utragen...
Project management,Process units (Dehy, TOX, WFE, LVT, HT, BOF,Flare, Thermal Fluid), Preliminary design of process equipment/P&ID's, piping layout,structural steel, control and instrumentation system, electrical distribution system...

Omega Refining

Our client, Omega Refining contracted Ultragen to design two new Vacuum Base Oil Fractionation towers for their Louisiana and Nevada plants. The new Louisiana site (greenfield project) will hydrotreat vacuum gas oils produced from re-refined motor oil to market grade base oils. This processing facility will yield a production of 7500 USGPD of three high quality base oil grades. The Nevada project was executed on a brown field site with an objective to produce 2500 USGPD of the same three market grade base oils....

Safety Kleen

Our client, Safety Kleen wanted to increase its reclaim oil hydro treating capacity by 25%. This is comparable to a production throughput at an incremental of 3500 BSPD.Ultragen successfully assisted the client in achieving their objective by pinpointing where the bottleneck was occurring, which made the expansion possible. Additionally, our team was able to work efficiently during the scheduled shut down period to identify the issue and to avoid any loss in production time.....